These socks were designed to introduce a novel, fun heel construction
for those who have already seen everything. I hope this pattern
inspires the experienced sock knitter and encourages the advanced
beginner to learn new techniques beyond her current repertoire.
Since the design is based on ordinary sock construction, the size and fit
of the sock is easy to adjust by the knitter.
photos: Nuoska
SIZE
M[L] (US 7| EU 38 and US 8/9|39/40,
respectively)
See Pattern Notes for guidelines for working a smaller version.
FINISHED MEASUREMENTS
Circumference: 7[8] inches
Foot length: 9.5[10] inches, adjustable
to fit (instructions are given in pattern notes)
MATERIALS
Yarn
Wollmeise
Sockenwolle 80/20 Twin[80 % Merino,
20 % PA; 510 yd/467 m per 150 g skein]; color Petit Poison nr.
5 or Petersilie; 1[1] skein (size M shown in green, Petersilie,
size L shown in burgundy, Petit Poison nr. 5)
Recommended needle size [always use a needle
size that gives you the gauge
listed below -- every knitter's
gauge is unique]
1
set of US #2.5/3 mm double-point needles
OR
US #2.5/3 mm circular needle for magic loop
1 US E /3.5 mm Crochet hook
Notions
Yarn
needle
extra
dpn for three-needle bind off
cable
needle
contrasting color waste yarn of similar weight for the provisional cast
on
2 stitch markers
GAUGE
30 sts/42 rounds = 4 inches in
stockinette stitch
PATTERN NOTES [Knitty's list of standard abbreviations and techniques can be found here.]
Construction:
These socks are knitted from the toe up. The socks are started below the
toes with a provisional cast on, and the toe is knitted flat using short
rows. The cast on sts are then picked up and the foot is worked in the
round, working increases to create gussets.
The heel is worked using short rows and the heel flap ornament
is knitted sideways and connected to
the heel at the same time. The ornament
is bound off together with gusset sts and
sts are picked up for the upper heel flap
along the side of the ornament.
The upper heel flap is worked flat and
the leg and cuff are worked in the round.
Notes on Sizing:
These socks fit best when worn with negative
ease – particularly in the length of the foot. The ornament
will be floppy if the sock does not
fit tightly on your foot.
To knit size S (US 5.5/6.5 | EU
36/37) socks,
use size M instructions and thinner yarn,
such as Araucania Ranco Solid [75 % Wool,
25 % Nylon; 376 yd/344 m per 100 g skein];
1 skein, at gauge 32 sts and 46 rows
/4 inches.
Sock circumference for size small is approx.
7 inches and length approx. 9 inches.
You can easily adjust the foot length by working an even
number of rounds less or extra before (or after) the
gusset increases. For adjusted sizing,
start working the gusset increases
4.5(5) inches short of desired foot
length and the heel 2.25(2.75) inches
short of desired foot length.
C2L: On RS, slip 1 st to cn and hold in front, k1 tbl,
then k1 tbl from cn. On WS, slip 1 st to cn and hold in front,
p1 tbl, then p1 tbl from cn.
C2R: On RS, slip 1 st to cn and hold
in back, k1 tbl, then k1 tbl from cn. On WS, slip 1 st to cn
and hold in back, p1 tbl, then p1 tbl from cn.
T2L: On RS, slip 1 st to cn and hold
in front, p1, then k1 tbl from cn. On WS, slip 1 st to cn and
hold in front, p1 tbl, then k1 from cn.
T2R: On RS, slip 1 st to cn and hold
in back, k1 tbl, then p1 from cn. On WS, slip 1 st to cn
and hold in back, k1, then p1 tbl from
cn.
Swyif: with yarn in front of right hand
needle, slip one st as if to purl. Pull
the yarn back tightly after slipping,
so that the st from previous row is pulled
on top of the right hand needle. Now
the st has two strands next to each other
and they will be knitted together the
next time the st is worked. This stitch
is often used in short row heels instead
of wrapping, especially in German patterns. A
tutorial can be found here; it’s
written in Finnish, but the pictures
are very helpful. Wrap and turn can be used
instead.
When the pattern requires you to slip
a stitch with yarn in front in the standard
manner, the instructions will indicate
this.
Instructions for working the crochet chain provisional
cast on can be found here.
Directions for Jeny's surprisingly strechy bind off can
be found here.
The three needle bind off is illustrated here.
Tips for working cables without a cable needle can be found
here.
Charts The chart for this pattern is very large and fits on a letter-sized
page.
Click here and print the resulting
page.
DIRECTIONS
TOE CO 26[30] sts using the crochet chain (or your favorite)
provisional cast on method.
Row 1 [WS]: P.
Row 2 [RS]: K.
Row 3 [WS]: Swyif, p25[29],
turn.
Row 4 [RS]: Swyif, k24[28],
turn.
Row 5 [WS]: Swyif, p23[27],
turn.
Row 6 [RS]: Swyif, k22[26],
turn.
Row 7 [WS]: Swyif, p21[25],
turn.
Row 8 [RS]: Swyif, k20[24],
turn.
Row 9 [WS]: Swyif, p19[23],
turn.
Row 10 [RS]: Swyif, k18[22],
turn.
Row 11 [WS]: Swyif, p17[21],
turn.
Row 12 [RS]: Swyif, k16[20],
turn.
Row 13 [WS]: Swyif, p15[19],
turn.
Row 14 [RS]: Swyif, k14[18],
turn.
Row 15 [WS]: Swyif, p13[17],
turn.
Row 16 [RS]: Swyif, k12[16],
turn.
Row 17 [WS]: Swyif, p11[15],
turn.
Row 18 [RS]: Swyif, k10[14],
turn.
Row 19 [WS]: Swyif, p9[13],
turn.
Row 20 [RS]: Swyif, k8[12],
turn.
Row 21 [WS]: Swyif, p7[11],
turn.
Size M only:
Proceed to final step of
first half of toe.
Final step of first half of toe: Row 1 [RS]: Swyif, k16[18],
knitting the two strands of each slipped
st together, turn. Row 2 [WS]: Slip with yarn
in front, p25[29], purling the two
strands of each slipped st together.
Second half of the toe: Row 1 [RS]: Slip one st wyib,
k16[18], turn. Row 2 [WS]: Swyif, p7, turn. Row 3 [RS]: Swyif, k6, work
the two strands of the next stitch
together, k1, turn. Row 4 [WS]: Swyif, p7, work
the two strands of the next stitch
together, p1, turn. Row 5 [RS]: Swyif, k8, work
the two strands of the next stitch
together, k1, turn. Row 6 [WS]: Swyif, p9, work
the two strands of the next stitch
together, p1, turn. Row 7 [RS]: Swyif, k10, work
the two strands of the next stitch
together, k1, turn. Row 8 [WS]: Swyif, p11, work
the two strands of the next stitch
together, p1, turn. Row 9 [RS]: Swyif, k12, work
the two strands of the next stitch
together, k1, turn. Row 10 [WS]: Swyif, p13, work
the two strands of the next stitch
together, p1, turn. Row 11 [RS]: Swyif, k14, work
the two strands of the next stitch
together, k1, turn. Row 12 [WS]: Swyif, p15, work
the two strands of the next stitch
together, p1, turn. Row 13 [RS]: Swyif, k16, work
the two strands of the next stitch
together, k1, turn. Row 14 [WS]: Swyif, p17, work
the two strands of the next stitch
together, p1, turn.
Row 15 [RS]: Swyif, k18, work
the two strands of the next stitch
together, k1, turn. Row 16 [WS]: Swyif, p19, work
the two strands of the next stitch
together, p1, turn. Row 17 [RS]: Swyif, k20, work
the two strands of the next stitch
together, k1, turn. Row 18 [WS]: Swyif, p21, work
the two strands of the next stitch
together, p1, turn. Row 19 [RS]: Swyif, k22, work
the two strands of the next stitch
together, k1, turn. Row 20 [WS]: Swyif, p23, work
the two strands of the next stitch
together, p1, turn. Row 21 [RS]: Swyif, k24, work
the two strands of the next stitch
together, k0[1], turn.
Size L only: Row 22 [WS]: Swyif, p25, work
the two strands of the next stitch
together, p1, turn. Row 23 [RS]: Swyif, k26, work
the two strands of the next stitch
together, k1, turn. Row 24 [WS]: Swyif, p27, work
the two strands of the next stitch
together, p1, turn. Row 25 [RS]: Swyif, k28, work
the two strands of the next stitch
together, turn.
For size M and L: Next row [WS]: Slip one stich with yarn
in front, p25[29], turn. Next row [RS]: Slip one stitch with yarn
in back, k25[29].
At the end of the final row do not turn, but pick up and knit
one st between the cast on sts and the sts on needle. Unravel
the provisional cast on, picking up 25[29] sts from the loops.
Knit the picked up sts, and pick up and knit one extra st between
the cast on sts and the first sts of the row. If required, place
a marker for start of round, and arrange needles for working
in the round. 53[61] sts.
FOOT AND GUSSETS
Left sock: Round 1: Work appropriate
cable chart row 1 across first 6 sts
of round; k to 1 st before end of round,
purl the last st together with the
first st of the next round (first st
of cable chart). 52[60] sts Round 2: Starting at stitch
2 of cable chart, work rem 5 sts of
row 2 of chart, k to end of round.
Continue to work as established until
10 full repeats of the cable chart are complete.
Gusset round 1: Work appropriate cable chart row 1
across first 6 sts of round, k1, m1,
knit 12[16] sts, m1, place marker, k to end of round. 54[62]
sts - 2 sts increased for
the gussets. Gusset round 2: Work even
in pattern. Gusset round 3: Work appropriate
cable chart as established, k1, m1,
k to marker, m1, slip marker, k8, m1,
knit to last st of round, m1, k1. 58[66]
sts - 4 sts increased, 2
sts increased for the gussets, 2 for the ornament. Gusset round 4: Work even
in pattern. Gusset round 5: Work the cable
chart as established, k1, m1, knit
to marker, m1, slip marker, knit to
end of round. 2 sts increased for the
gussets. Gusset round 6: Work even
in pattern.
Work Gusset rounds 3-6 three times more.
8 sts increased
for the heel ornaments, 18 sts increased
for the gussets.
Next round: Work cable chart as established and
k to last 4 sts of the round. The
markers can be removed on this round. Turn
so that WS is facing.
Proceed to HEEL.
Right sock: Round 1: K19[23] sts, place
marker, k1, work appropriate cable
chart row 1 across next 5 sts, p2tog
(last st of chart with next st); k
to end of round. 52[60] sts. Round 2: Knit to cable, work
the cable chart as established and
knit to end.
Continue to work as established until
10 full repeats of the cable chart are complete.
Gusset round 1: K7, m1, k to marker, m1, slip marker,
work in pattern to end of round. 54[62] sts - 2 sts increased
for the gussets. Gusset round 2: Work even
in pattern.
Gusset round 3: K7, m1, k to marker,
m1, slip marker, k1, work the cable chart, k1, m1, knit to last
st of round, m1, k1. 58[66] sts - 4 sts increased, 2 for the
gussets and 2 for the ornament. Gusset round 4: Work even in pattern. Gusset round 5: K7, m1, k to marker, m1, slip marker, work in
pattern to end of round. 2 sts increased for the gussets. Gusset round 6: Work even in pattern.
Work Gusset rounds 3-6 three
times more.
8 sts increased for the heel ornaments,
18 sts increased for the gussets.
Repeat Gusset rounds 5 & 6 1[3] more times. 20[24]
gusset sts increased, 80[92] sts. Next round: Work as established
to the 4 last sts of round, removing
markers as you go. Turn so that WS is
facing.
Heel Flap Ornament Left sock: Row 1 [RS]: Swyif, knit to
cable working the two strands of slipped
sts together. Work the cable chart
as established, k2 and turn.
You will have 12 sts on working needle
when working rows 2 and 3. The 26[30] heel sts will be worked
together one at a time with the 12 working sts. 42[50] instep
sts are left on hold. Row 2 [WS]: Slip 1 st with yarn
at front, p1, work the cable chart, p3, p2tog,
turn. Row 3 [RS]: Slip 1 st with yarn at the back of work, knit 3
st, work the cable chart, k2, turn.
Repeat Rows 2 and 3 until all heel bottom sts have been
worked together with the ornament, ending
with row 2. Remember to work the two strands of slipped sts as
one st. You have now 12 working sts and 42[50] instep sts on
hold.
Right sock: Row 1 [RS]: Swyif, knit to cable chart
working the two strands of slipped sts together. Work the cable
chart as established, k3, ssk (remember to work the two strands
of slipped st as one st), turn.
You will have 12 sts on working needle
when working rows 2 and 3. The 26[30]
heel sts will be worked together one
at a time with the 12 working sts. 42[50] instep sts are left
on hold. Row 2 [WS]: Slip 1 st with yarn at front,
p3, work the cable chart, p2, turn. Row 3 [RS]: Slip 1 st wyib, k1, work
the cable chart, knit 3 sts, ssk, turn.
Repeat Rows 1 and 2 until all 26[30]
heel bottom sts have been worked together
with the ornament, ending with Row 3. Note: Remember
to work the two strands of each slipped
st together.
You
now have 12 working sts and 42[50]
instep sts on hold.
Upper heel flap Turn work so that the right sides of the ornament heel flap
and the gusset sts are together. Pick one st between the ornament
and gusset sts and place it on the needle with the gusset sts.
Use the three needle bind off to bind off 12 sts on both needles.
The remaining st will become the first st of the upper heel flap.
Left sock:
Turn the work so that the right side
of the ornament is facing you and pick up and knit 25[29]
sts from the ornament top loops for the heel flap. Turn so
that WS is facing.
Heel flap row 1 [WS]: Slip one st with yarn at front,
work the cable chart, [p1 tbl, k1] until 1 heel flap st rems;
p this last heel flap st together with the first gusset st.
Turn. Heel flap row 2 [RS]: Slip 1 wyib,[p1,
k1 tbl] 9[11] times to cable pattern,
ssk. Turn.
Repeat heel flap rows 1 and 2 1[3] times more.
Work
heel flap row 1 once more.
This will be the beginning of the round.
52[60] sts.
Right sock:
Turn the work so that the wrong side
of the ornament is facing you and pick up and purl 25[29]
sts from the ornament top loops for the heel flap. Turn so
that RS is facing.
Heel flap row 1 [RS]: Slip 1 wyib, work the cable chart,[k1
tbl, p1] until one heel flap st remains; ssk the last heel flap st together
with the first gusset st. Turn. Heel flap row 2 [WS]: Slip one st with yarn at front,[k1, p1
tbl] 9[11] times to cable chart, work cable chart, purl together last
st of heel flap and first gusset st. Turn.
Repeat Heel flap rows 1 and 2 1[3] times more.
Work Heel
flap row 1 once more, but do not turn. This will be the
beginning of the round. 52[60] sts.
Note: You
will now resume working in the round.
LEG Left Sock: Leg round[RS]: k1 tbl,[p1,k1 tbl] 9[11] times to
cable pattern, work cable chart, k1 tbl, knit to end of the round.
Work as established until 10 repeats of cable chart are complete. Ribbing round 1: K1 tbl, [p1,
k1 tbl] 9[11] times to cable pattern,
work cable chart, k1 tbl [p1, k1 tbl]
12[14]times, p2tog. 51[59] sts remain. Ribbing round 2: K1 tbl,[p1, k1 tbl]
9[11] times to cable pattern, work cable
chart, [k1 tbl, p1] 13[15] times.
Repeat Ribbing round 2 until 2 repeats of cable chart
are complete. Work 2 more rounds.
Proceed to FINISHING.
Right Sock: Leg round: K26[30], k1 tbl, work cable chart, [k1
tbl, p1] 9[11] times, k1 tbl.
Work as established until 10 repeats
of cable chart are complete.
Ribbing round 1: P2tog,[k1 tbl, p1] 12[14] times,
k 1tbl, work cable chart, k1 tbl, [p1,
k1 tbl] 9[11]times. 51[59] sts remain. Ribbing round 2:[P1, k1 tbl]
13[15] times, work cable chart, k1tbl,
[p1, k1tbl] 9[11] times.
Repeat Ribbing round 2 until 2 repeats of cable chart
are complete. Work 2 more rows.
Proceed to FINISHING.
FINISHING
Bind off all sts using Jeny's Surprisingly
Stretchy Bind Off (see pattern notes).
Weave in ends and block.
ABOUT THE DESIGNER
Nuoska is a Finnish word for the kind of
wet snow one can make snow balls with.
You can find her under the
name Nuoska on
Ravelry.