Chapter 5: Heating, Ventilation, and Air Conditioning Systems and Components

Document Navigation for "MD 15161 – 2013 Control of Legionella in Mechanical Systems"

5.1 General

  • 5.1.1 Components of Heating, Ventilation, and Air Conditioning (HVAC) systems that may have risks associated with Legionella include air filters, humidifiers, condensate pans, and any other areas where water may be present.

5.2 Air Filters

  • 5.2.1 Design Requirements
    • 5.2.1.1 For new primary air handling equipment, excluding packaged type, provide high-efficiency filters with a minimum Minimum Efficiency Reporting Value (MERV) rating of 13. For packaged type primary air handling equipment provide high efficiency filters with a minimum MERV rating of 13 where possible.
    • 5.2.1.2 For existing air-handling systems, consider filter upgrade to MERV 13.
    • 5.2.1.3 Design the air filter assembly to help prevent contamination of the air supply during maintenance.
  • 5.2.2 Operation & Maintenance
    • 5.2.2.1 Inspect filters, frames, chambers, and housing for general condition and integrity of fit weekly for primary air handling equipment and at least annually for terminal air handling equipment.
    • 5.2.2.2 Replace filters found to be in poor condition.

5.3 Humidifiers

  • 5.3.1 Design Requirements
    • 5.3.1.1 Humidifiers forming part of any new HVAC system shall be indirect steam injection type.
    • 5.3.1.2 Systems that use untreated potable water are preferred as maintenance requirements are lower and chemicals are not released into the airstream.
    • 5.3.1.3 Direct steam from treated boiler water or other treated sources shall not be used.
    • 5.3.1.4 Evaporative pan, drum-type, water spray-type, sprayed coil-type humidifiers or air washers shall not be used in new building designs.
    • 5.3.1.5 During renovation projects, existing humidifiers shall be replaced with approved types of humidifiers.
    • 5.3.1.6 For existing buildings, existing humidifiers systems can continue to operate only if proper precautions are taken to minimize microbial growth, including regular scheduled maintenance, total avoidance of water stagnation in the humidifiers, the use of biocides, and chemical treatment. If this is not practicable, the humidifiers shall be taken out of service.
    • 5.3.1.7 Avoid the use of room humidifiers and misters, as they can provide a ready source of aerosols for dissemination of bacteria.
    • 5.3.1.8 Include a provision to drain the systems when not in use to prevent standing water.
    • 5.3.1.9 Design systems to allow for adequate access for inspection and maintenance.
  • 5.3.2 Operation and Maintenance
    • 5.3.2.1 Start-up and maintenance procedures must include cleaning and inspections for all key components of the systems.
    • 5.3.2.2 Visually inspect humidifiers for signs of microbial growth, sediment or stagnant water at least once a month for non steam systems and every 3 months for steam systems.
    • 5.3.2.3 If stagnant water accumulation is observed, follow the test protocol indicated in Section 5.3.3 below.
    • 5.3.2.4 Maintain, clean and drain these systems following manufacturer recommendations when visual inspection indicates a problem
    • 5.3.2.5 Disinfect system when bacterial testing results exceed action limits.
  • 5.3.3 Minimum Bacterial Testing Requirements

Water Sampling Locations

  • 5.3.4 Water sampling locations for bacterial testing shall be in accordance with the facility Legionella Bacteria Control Management Program (LBCMP).
  • 5.3.5 The facility LBCMP should consider, at a minimum, the following locations for water sampling:
    • 5.3.5.1 Water reservoirs
    • 5.3.5.2 Stagnant water

Bacterial Testing Results

  • 5.3.6 Record the bacterial testing results on the facility LBCMP testing form (LBCMP-4).
  • 5.3.7 Report the bacterial testing results in accordance with the regional and national reporting protocols.

Minimum Bacterial Testing Requirements (Normal Operation)

  • 5.3.8 While the system is in normal operation, perform dipslide tests monthly for non steam systems and every three months for steam systems to determine the total bacteria count (TBC) where stagnant water is present. Refer to Figure 3 located in Appendix D.
  • 5.3.9 While the system is in normal operation, every three months perform Legionella bacteria culture tests on non-steam systems, to identify Legionella pneumophila serogroup1 (LPSG1), total Legionella pneumophila including all serogroups (LPTOT) and the Non-Legionella pneumophila Legionella (NLPL) bacteria levels. Refer to Figure 3 located in Appendix D.

Minimum Bacterial Testing Requirements and Frequency (Emergency Mode)

  • 5.3.10 Use the emergency-mode bacterial test procedure if:
    • 5.3.10.1 There have been multiple reported cases of Legionnaires' disease in the past 30 days in the region within a 10 km radius of the building location and/or,
    • 5.3.10.2 The building has had recurring Legionella bacteria levels detected by the Legionella bacteria culture test that required disinfection of the system within the past 90 days and/or,
    • 5.3.10.3 Regional Health authorities direct more stringent bacterial testing.
  • 5.3.11 Unless directed otherwise by the regional health authority, or due to regional restrictions, a weekly Quantitative Polymerase Chain Reaction (qPCR) test should be performed to obtain rapid, Legionella specific results, to determine the Legionella Pneumophila bacteria count at each water sampling location.

Dipslide Testing Limits and Actions

  • 5.3.12 When the TBC is less than 1,000:
    • 5.3.12.1 Continue with normal Operation and Maintenance (O&M).
  • 5.3.13 When TBC is between 1,000 and 10,000:
    • 5.3.13.1 Review and adjust the O&M procedures and ensure proper drainage.
  • 5.3.14 When TBC exceeds 10,000:
    • 5.3.14.1 Clean and disinfect the system within 48 hours.
    • 5.3.14.2 Review and adjust the O&M procedures and ensure proper drainage.
    • 5.3.14.3 Wait one week then perform a Legionella bacteria culture test in accordance with clauses 5.3.15 through 5.3.18 below.

Legionella Bacteria Culture Testing Limits and Actions

  • 5.3.15 Perform Legionella bacteria culture test in accordance with ISO 11731-1998 and ISO/TS 11731-2-2004.
  • 5.3.16 When the LPSG1 count and/or the LPTOT count is less than 1 colony forming unit per millilitre (cfu/mL), and/or the NLPL count is less than 1,000 cfu/mL:
    • 5.3.16.1 Continue with normal O&M.
  • 5.3.17 When the LPSG1 count is between 1 and 10 cfu/mL, and/or the LPTOT count is between 1 and 100 cfu/mL, and/or the NLPL count is between 1,000 and 10,000 cfu/mL:
    • 5.3.17.1 Clean and disinfect the system within 48 hours.
    • 5.3.17.2 Review and adjust the O&M procedures and ensure proper drainage.
    • 5.3.17.3 Repeat the Legionella bacteria culture test after one week.
  • 5.3.18 When the LPSG1 count exceeds 10 cfu/mL, and/or the LPTOT exceeds 100 cfu/mL, and/or the NLPL count exceeds 10,000 cfu/mL:
    • 5.3.18.1 Shut down the system and immediately clean and disinfect the system.
    • 5.3.18.2 Review and adjust the O&M procedures and ensure proper drainage.
    • 5.3.18.3 Repeat the Legionella bacteria culture test after one week.

qPCR Testing Limits and Actions

  • 5.3.19 Perform qPCR Test in accordance with ISO/TS 12869
  • 5.3.20 When the Legionella pneumophila bacteria count is less than 10 Genome equivalents per millilitre (GE/mL):
    • 5.3.20.1 Continue with normal O&M.
  • 5.3.21 When the Legionella pneumophila bacteria count is between 10 and 100 GE/mL:
    • 5.3.21.1 Review and adjust the O&M procedures and ensure proper drainage.
  • 5.3.22 When the Legionella pneumophila bacteria count exceeds 100 GE/mL:
    • 5.3.22.1 Clean and disinfect the system within 48 hours.
    • 5.3.22.2 Review and adjust the O&M procedures and ensure proper drainage.
    • 5.3.22.3 Wait one week then perform a Legionella bacteria culture test in accordance with clauses 5.3.15 through 5.3.18 above.

5.4 Operation, Maintenance and Testing Schedule for Humidifiers

  • 5.4.1 Table 5.1 below indicates a summary of the minimum frequency for operation, maintenance and testing requirements of humidifiers:
Table Summary

This table indicates a summary of the minimum frequency for operation, maintenance and testing requirements of humidifiers.

Table 5.1: Humidifiers O&M and Testing Summary
Activity Item Frequency
Operation & Maintenance Inspection
  • During start-up procedure
  • Non Steam Systems: Monthly when system is in operation
  • Steam Systems: Every 3 months when system is in operation
Cleaning
  • During start-up procedure
  • Monthly when system is in operation
Disinfection
  • When required by bacterial testing results
Testing Dip-slide test
  • Non Steam Systems: Monthly, when system is in operation and stagnant water is present.
  • Steam Systems: Every 3 months when system is in operation and stagnant water is present.
Legionella bacteria culture test
  • Non Steam Systems:Every three months when system is in operation
  • When dip-slide test results indicate TBC > 10,000 cfu or qPCR test results indicate Legionella Pneumophila > 100 GE/mL
qPCR Test
  • Weekly, when used during emergency mode

5.5 Drain Pans

  • 5.5.1 Design and Requirements
    • 5.5.1.1 This section applies to new equipment and to major upgrades to existing equipment.
    • 5.5.1.2 Drain pans shall be designed for easy cleaning.
    • 5.5.1.3 Drain connections shall be in the bottom or in a depression in the side of the pan to eliminate standing water in the pan.
    • 5.5.1.4 Drain pans shall be equipped with deep seal trap rated for twice the maximum static pressure in the system.
  • 5.5.2 Operation and Maintenance
    • 5.5.2.1 Start-up and maintenance procedures must include cleaning and inspections for all key components of the systems.
    • 5.5.2.2 Visually inspect drain pans for signs of microbial growth, sediment and/or stagnant water at least once a month for primary air handling equipment and annually for 20% of terminal air handling equipment such that all of the equipment is inspected over a 5 year period.
    • 5.5.2.3 Check for water accumulation in drain pans, and if there is any water accumulation, ensure that the drain pans are draining properly.
    • 5.5.2.4 Maintain and clean drain pans following manufacturer recommendations at least yearly.

5.6 Operation and Maintenance Schedule for Drain Pans

  • 5.6.1 Table 5.2 below indicates a summary of the minimum frequency for operation and maintenance requirements of drain pans:
Table Summary

This table indicates a summary of the minimum frequency for operation and maintenance requirements of drain pans.

Table 5.2: Drain Pans O&M Summary
Activity Item Frequency
Operation & Maintenance Inspection
  • During start-up procedure
  • Primary air handling equipment: Monthly when system is in operation
  • Terminal air handling equipment: Annually 20% of the systems such that all systems are inspected every 5 years.
Cleaning
  • During start-up procedure
  • Annually
Disinfection
  • When required by bacterial testing results

Document Navigation for "MD 15161 – 2013 Control of Legionella in Mechanical Systems"