Project Number: 120

Carruthers Pond


Project Type: Channel Restoration, Habitat Improvement

Contact:


Glenn Harrington
Little Rouge Restoration Project

Box 88005 Cliffcrest Plaza, 2975 Kingston Road,
Toronto, Ontario M1M 3W1
Phone: 416-282-9983 Fax: 416-282-9983
E-mail: Markham@harrington-hoyle.com
World Wide Web: http://www.harrington-hoyle.com

Geographic Location:

Township:Whitchurch-Stouffville
Watershed: Rouge River
Stream Size: 2nd Order
UTM Grid Coordinates: 17 637013 E 4866647 N
 

Purpose:

To mitigate impact of a large dam.

Objectives:

To maintain water temperature and help flow of sediment and nutrients through the system. To reconnect aquatic and terrestrial corridors.

Description:

A stream channel and wetland pockets were constructed within the impoundment above the dam. Future works include a new channel that will bypass the old dam.

Estimated Cost: $22,000.00 Construction Date: 1998 and ongoing Volunteer Effort: 1000 hrs

Funding Sources:

Rouge Park Alliance, Environment Canada (Action 21)

Project Partners:

Landowner, Harrington and Hoyle Ltd., University of Guelph, OMNR, TRCA, Ryder Trucks