Initial Inspection and Reinspection Process

Flow chart documenting the process for inspection of fish products. Identify the lot, detain the lot, sample the lot, examine the lot and make decision. If accepted, lot released. If rejected, the lot is either disposed or detained for reinspection. Option to suspend the decision. Lot is detained. Offer accepted and conditions are met. Lot culled, reworked or reconditioned. Lot sampled, then examined and decision made, either accepted then released, or rejected, Reinspection then offered. If reinspection refused, lot rejected and disposed of. If reinspection accepted, lot may be culled or reworked. Lot sampled, examined, and a decision made, either accept and released, or reject and disposed of.