Chapter 5: Heating, Ventilation, and Air Conditioning Systems and Components

Document navigation for "Mechanical design 15161—2013 control of Legionella in mechanical systems"

5.1 General

5.2 Air filters

5.3 Humidifiers

Water sampling locations

Bacterial testing results

Minimum bacterial testing requirements (normal operation)

Minimum bacterial testing requirements and frequency (emergency mode)

Dipslide testing limits and actions

Legionella bacteria culture testing limits and actions

Quantitative polymerase chain reaction testing limits and actions

5.4 Operation, maintenance and testing schedule for humidifiers

Table summary

This table indicates a summary of the minimum frequency for operation, maintenance and testing requirements of humidifiers.

Table 5.1: Humidifiers operation and maintenance and testing summary
Activity Item Frequency
Operation & maintenance Inspection
  • During start-up procedure
  • Non Steam Systems: Monthly when system is in operation
  • Steam Systems: Every 3 months when system is in operation
Cleaning
  • During start-up procedure
  • When visual inspection indicates a problem
Disinfection
  • When required by bacterial testing results
Testing Dip-slide test
  • Non Steam Systems: Monthly, when system is in operation and stagnant water is present.
  • Steam Systems: Every 3 months when system is in operation and stagnant water is present.
Legionella bacteria culture test
  • Non Steam Systems:Every three months when system is in operation
  • When dip-slide test results indicate TBC > 10,000 cfu
  • When a qPCR test results indicate Legionella Pneumophila  100 GE/mL
qPCR test
  • Weekly, when used during emergency mode
  • When a Legionella culture test results indicate LPTOT cfu/mL
  • When a qPCR test results indicate Legionella Pneumophila > 100 GE/mL

5.5 Drain pans

5.6 Operation and maintenance schedule for drain pans

Table summary

This table indicates a summary of the minimum frequency for operation and maintenance requirements of drain pans.

Table 5.2: Drain pans operation and maintenance summary
Activity Item Frequency
Operation & maintenance Inspection
  • During start-up procedure
  • Primary air handling equipment: Monthly when system is in operation
  • Terminal air handling equipment: Annually 20% of the systems such that all systems are inspected every 5 years.
Cleaning
  • During start-up procedure
  • Annually
Disinfection
  • When required by bacterial testing results

Document navigation for "Mechanical design 15161—2013 control of Legionella in mechanical systems"